Project Overview

Contract: Phase B Contract

Project Description: Construction of stormwater networks in the Municipality of Paiania,

This project is the second phase of the construction of the rainwater network of the Municipality of Paiania in order to strengthen the flood protection of the area.

  • More specifically, the projects that were constructed are the following:
  • Construction of Central Collector OP2
  • Construction of a Network of Rainwater Pipelines in the streets within the designated area of ​​the Municipality of Paiania, with a total length of 27,270 m, diameter from 500mm to 2200mm, as well as visit wells (660) and water collection wells (459)
  • Construction of rainwater pipes on Nikologianni, V. Sofias, Spyrou Dimas and Anapafseos streets, with a total length of 865 m.
  • Arrangement works of branches PB1, PB1.1, PB1.2, PB2 North Stream of Paiania in a total length of 2,750 m

Information

info-icon1
SIGNATURE OF CONTRACTS:

September 2013

info-started
STARTING DATE:

September 2013

info-check-square
EXPECTED COMPLETION:

November 2019

info-locations
LOCATION:

Attica - GREECE

info-value
VALUE OF PROJECT:

€16.299.051.69